HSA Golden
  • Who We Are
  • Services
    • Landfill & Solid Waste Engineering
    • Waste Transfer & Recycling
    • Waste to Energy
    • Mining
    • Contamination & Remediation
    • Phase I and II Environmental Site Assessments
    • Site Development Engineering
    • Water Supply & Hydrogeology
    • Litigation Support
  • In the News
  • Contact Us
    • +1 407 649 5475
Site Remediation: Consolidated-Tomoka Land Co Pumphouse Site

Site Remediation: Consolidated-Tomoka Land Co Pumphouse Site

Consolidated-Tomoka Land Company is a Florida-based publicly traded real estate company, which owns a portfolio of income investments in diversified markets in the United States, including more than 1.9 million square feet of income properties, as well as approximately 8,200 acres of land in the Daytona Beach area.

Consolidated Tomoka Land Company

Consolidated-Tomoka Land Company is a Florida-based publicly traded real estate company, which owns a portfolio of income investments in diversified markets in the United States, including more than 1.9 million square feet of income properties, as well as approximately 8,200 acres of land in the Daytona Beach area.

CLIENT INFORMATION

  • Client Since:

    2015

  • Client Location:

    Daytona Beach, Florida

  • Industry Sector:

    Corporation | Industry

PROJECT INFORMATION

  • City/County:

    Lake Placid

  • State:

    Florida

  • Country:

    United States of America

  • Status:

    Ongoing

OPPORTUNITY
  • OPPORTUNITY
  • SOLUTION
  • SUCCESS

Years lubricating oil and diesel fuel discharges at a citrus grove pumphouse in Central Florida resulted in impact to soil and groundwater.  Soil excavation, air sparging, and monitored natural attenuation, all performed by others, failed to remediate the site, and plume migration into a nearby lake necessitated action.  HSA Golden was contracted to review previous work, perform additional testing, and design and implement remedial measures to achieve No Further Action status.

  • Drill deep soil borings to properly characterize site geology.
  • Install 25 additional monitoring wells and collect/chemically analyze groundwater samples from all 38 wells at the site.
  • Perform eight-hour pumping test to calculate aquifer transmissivity.
  • Design pump-and-treat system, using MODFLOW, to demonstrate plume capture and prevent plume migration into downgradient lake.
  • Install, operate, and monitor system performance.
  • Groundwater flow modeling showed 25 recovery wells, in four rows, would best capture the contaminant plume.
  • System total combined pumping rate is 200 gallons per minute.
  • Treatment consisted of aeration only, with discharge to a settling basin to precipitate iron, and then to two open infiltration galleries. 
  • Simplified treatment design minimized maintenance requirements.
  • Aggressive groundwater treatment is expected to result in relatively short-term remediation time frame (under two years).

we are ready for your next project

Thanks again for looking over our site and considering us for help with your project. We would be pleased to assist you with your environmental engineering and consulting needs, whether they are large or small. Please take a moment and fill out as much of the form below as you can, and someone from our firm will quickly respond to your inquiry request. Or, just pick up the phone and call us at +1 407 649 5475.





    Orange County Continuing Environmental Services Contract Expert Testimony: Personal Injury Acid Burn Case
    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Quick Links

    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Contact Information

    HSA Golden
    11 Lake Gatlin Road
    Orlando, Florida 32806
    USA

    +1 407 649 5475

    Newsletter

    Subscribe to receive the latest news and project updates from HSA Golden.


      © 2020 HSA Golden | Environmental and Engineering Consultants | Orlando, Florida USA