HSA Golden
  • Who We Are
  • Services
    • Landfill & Solid Waste Engineering
    • Waste Transfer & Recycling
    • Waste to Energy
    • Mining
    • Contamination & Remediation
    • Phase I and II Environmental Site Assessments
    • Site Development Engineering
    • Water Supply & Hydrogeology
    • Litigation Support
  • In the News
  • Contact Us
    • +1 407 649 5475
Limestone Mine and Cement Plant Permitting

Limestone Mine and Cement Plant Permitting

In 2006, a state of the art cement facility was designed to meet the needs of the growing Florida market. American Cement Company's Sumterville Plant was innovatively designed to be cost efficient and able to produce 1.2 million short tons of cement per year. With the use of cutting edge technology and the collective expertise of our employees, ACC produces a high quality product that is distributed throughout Florida.

Limestone Mine and Cement Plant Permitting

In 2006, a state of the art cement facility was designed to meet the needs of the growing Florida market. American Cement Company’s Sumterville Plant was innovatively designed to be cost efficient and able to produce 1.2 million short tons of cement per year. With the use of cutting edge technology and the collective expertise of our employees, ACC produces a high quality product that is distributed throughout Florida.

CLIENT INFORMATION

  • Client Since:

    2005

  • Client Location:

    Sumterville, Florida

  • Industry Sector:

    Corporation | Industry

PROJECT INFORMATION

  • City/County:

    Sumter County

  • State:

    Florida

  • Country:

    United States of America

  • Status:

    Completed

OPPORTUNITY
  • OPPORTUNITY
  • SOLUTION
  • SUCCESS

Client required design and permitting for a $150M, 250-acre limestone mine, 50-acre portland cement plant site, and one-mile access road, on a site totaling 1,300 acres.

  • Prepared and submitted a Sumter County Conditional Use and Operating Permit.
  • Prepared and submitted a Water Use Permit (from Southwest Florida Water Management District [SWFWMD]) for mine dewatering operations.
  • Prepared and submitted an Environmental Resource Permit (ERP) for the Florida Department of Environmental Protection.
  • Supporting activities included groundwater flow modeling to demonstrate that nearby wetlands would not be significantly impacted by mine dewatering and cement manufacturing.
  • All permits were obtained in less than one year.
  • Project was completed ahead of schedule.

we are ready for your next project

Thanks again for looking over our site and considering us for help with your project. We would be pleased to assist you with your environmental engineering and consulting needs, whether they are large or small. Please take a moment and fill out as much of the form below as you can, and someone from our firm will quickly respond to your inquiry request. Or, just pick up the phone and call us at +1 407 649 5475.





    Counts Limerock Mine Granja Jeroa
    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Quick Links

    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Contact Information

    HSA Golden
    11 Lake Gatlin Road
    Orlando, Florida 32806
    USA

    +1 407 649 5475

    Newsletter

    Subscribe to receive the latest news and project updates from HSA Golden.


      © 2020 HSA Golden | Environmental and Engineering Consultants | Orlando, Florida USA