Phase I & II Environmental Site Assessment: Former Citrus Grove


This project was performed for an out-of-state, private investor.
CLIENT INFORMATION
- Client Since: 2022
- Client Location: Oak Park, Illinois
- Industry Sector: Investor
PROJECT INFORMATION
- Project Location: Astatula, Florida)
- Status: Complete
OBJECTIVE
Phase I & II Environmental Site Assessments were requested to support the purchase of a 29-acre, vacant, lakefront property. The site was formerly used for citrus cultivation, which has well-known implications for potential environmental impacts.
PROJECT SCOPE
The Phase I Environmental Site Assessment (ESA) included:
- Review of site physical characteristics.
- Review of reasonably ascertainable historical information and previous environmental reports prepared by others.
- Review of environmental record sources maintained by federal, state, and local regulatory agencies.
- Performance of a site reconnaissance, including a visual inspection of adjacent sites.
- Performance of interviews with local government representatives and with site owners, operators, and managers.
The Phase II Environmental Site Assessment (ESA) included:
- Drilling of 33 soil borings to collect and chemically analyze soil samples.
RESULTS
The Phase I ESA revealed one Recognized Environmental Condition (REC) and one Business Environmental Risk (BER) in connection with the site:
- An irrigation well/fill station was identified as a REC, due to the assumed mixing of agricultural chemicals and the potential for release of these chemicals.
- The former usage of the site for citrus groves constituted a BER, since the (assumed) legal application of agricultural chemicals does not constitute a “release to the environment,” and therefore does not constitute a REC.
- Chemical analyses of the soil samples for total arsenic and organochlorine pesticides did not indicate elevated concentrations of these parameters.