HSA Golden
  • Who We Are
  • Services
    • Landfill & Solid Waste Engineering
    • Waste Transfer & Recycling
    • Waste to Energy
    • Mining
    • Contamination & Remediation
    • Phase I and II Environmental Site Assessments
    • Site Development Engineering
    • Water Supply & Hydrogeology
    • Litigation Support
  • In the News
  • Contact Us
    • +1 407 649 5475
Soles 1 and 2

Soles 1 and 2

Design, construct, operate, and monitor an 7,600 M3 anaerobic digester system that optimizes retention time and maximizes CH4 capture.

Soles 1 and 2

Design, construct, operate, and monitor an 7,600 M3 anaerobic digester system that optimizes retention time and maximizes CH4 capture.

CLIENT INFORMATION

  • Client Since:

    2010

  • Client Location:

    Sonora, Mexico

  • Industry Sector:

    Corporation | Industry

PROJECT INFORMATION

  • City/County:

    Sonora

  • Country:

    Mexico

  • Status:

    Completed

OPPORTUNITY
  • OPPORTUNITY
  • SOLUTION
  • SUCCESS
  • Design, construct, operate, and monitor an 7,600 M3 anaerobic digester system that optimizes retention time and maximizes CH4 capture.
  • Develop and implement practice changes in animal waste management system from open lagoons to an anaerobic digester system.
  • Design, construct, operate, and monitor an anaerobic digester system.
  • Develop a Clean Design Mechanism (CDM) project for sale of Certified Emissions Reductions (CERs).
  • Design and construct carbon-neutral source of renewable energy to supply constant biogas to a 60 KW generator.
  • Provide a renewable free source of energy from farm waste.
  • Client reduced electric bill by generating power using biogas (free source of energy).
  • Reduced greenhouse gas emissions on livestock farm.
  • Created new revenue stream for client from the sale of greenhouse gas emission reductions.
  • Reduced odor and fly population, benefitting both client and surrounding neighborhoods.
  • Improved waste-effluent fertilizer quality.
  • Prevented groundwater and surface water contamination.
  • Allowed client to increase production capacity without violating environmental regulations.
  • Reduced client’s effluent discharge BOD and COD levels.
  • Helped client meet environmental laws and regulations.

we are ready for your next project

Thanks again for looking over our site and considering us for help with your project. We would be pleased to assist you with your environmental engineering and consulting needs, whether they are large or small. Please take a moment and fill out as much of the form below as you can, and someone from our firm will quickly respond to your inquiry request. Or, just pick up the phone and call us at +1 407 649 5475.





    Granja Jeroa Fedepalma Palm Oil Mills
    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Quick Links

    • Home
    • Who We Are
    • Clients
    • Contact
    • In the News
    • Testimonials

    Contact Information

    HSA Golden
    11 Lake Gatlin Road
    Orlando, Florida 32806
    USA

    +1 407 649 5475

    Newsletter

    Subscribe to receive the latest news and project updates from HSA Golden.


      © 2020 HSA Golden | Environmental and Engineering Consultants | Orlando, Florida USA